TNEB Chengalpattu Circle (Chennai South) Region Shut Down Dates of July 2015

0
[Image: attachment.php?aid=32872]
TANGEDCO

Chengalpattu Electricity Distribution Circle.
- Shut down for the month of  July 2015

Here is the approved Schedule of Substation Shut down, proposed for the month of  July 2015 in Chengalpattu Electricity Distribution Circle is enclosed herewith. Duration of Total shutdown may be from 9.00AM to 2.00PM.

Contains Shut Down details of Following Sub-Station :
  • Alathur 110KV SS
  • Thirukazhukundram 110 KV SS  
  • Thiruninravur 110 KV SS.
  • Kadambathur  110 KV SS
  • Perambakkam 110 KV SS
  • Thirumazhisai 110 KV SS.
  • Acharapakkam 110 KV SS                                                   
  • Potheri 110 KV SS.
  • Sriperumbudur 110 KV SS                              
  • Mambakkam 110 KV SS
  • Vadakkupattu 110 KV SS 
  • Nellikuppam 110 KV SS.
  • Irrungattukottai 110 KV SS 
  • Unamanchery 110 KV SS 
  • Maraimalai nagar 110 KV SS
  • Padappai  110 KV SS
  • Moosivakkam 110 KV SS.
  • Thiruporur 110 KV SS
  • Cheyyur 110 KV SS
  • Illedu 110 KV SS.
  • Anjur 110 KV SS.
  • Velur 110 KV SS
  • 110 KV Omega  SS
  • Chengalpattu 110 KV SS
  • 33 KV substation 
  • Poonchery 33 KV SS
  • Nerumbur 33 KV SS 
  • Vengambakkam 33 KV SS
  • Nugumbal 33 KV SS           
  • Orathy 33 KV SS                 
  • Polambakkam 33 KV SS
  • Maduranthagam 33  KV SS.
  • Ramapuram 33 KV SS.
  • Kunnavakkam 33KV SS
  • S.V.Chatram 33 KV SS. 
  • Veerapuram 33 KV SS.
  • Guduvanchery 33 KV SS                            
  • Sidco Maraimalai nagar33 KV SS                
  • Palayanur unmanned SS.
  • CMC Chengalpattu (Unmanned) SS 
  • Kilanur 33 KV SS.
  • Mappedu 33 KV SS
  • Adayalachery 33 KV SS 
  • Kadugupattu 33 KV SS
  • Vedhachalanagar 33 KV SS. (Unmanned)
  • Salavakkam  33 KV SS.
Attachment : 
.xls   Shut Down July 2015.xls (Size: 26.5 KB / Downloads: 260)