TNEB Chengalpattu (Chennai South) Region Shut Down Dates of June 2015

0
   
TANGEDCO
Chengalpattu Electricity Distribution Circle.
- Shut down for the month of  June – 2015


Here is the approved Schedule of Substation Shut down, proposed for the month of  June – 2015 in Chengalpattu Electricity Distribution Circle is enclosed herewith. Duration of Total shutdown may be from 9.00AM to 2.00PM.

Contains Shut Down details of Following Sub-Station :
  • Alathur 110KV SS
  • Thirukazhukundram 110 KV SS  
  • Thiruninravur 110 KV SS.
  • Kadambathur  110 KV SS
  • Perambakkam 110 KV SS
  • Thirumazhisai 110 KV SS.
  • Acharapakkam 110 KV SS                                                   
  • Potheri 110 KV SS.
  • Sriperumbudur 110 KV SS                              
  • Mambakkam 110 KV SS
  • Vadakkupattu 110 KV SS 
  • Nellikuppam 110 KV SS.
  • Irrungattukottai 110 KV SS 
  • Unamanchery 110 KV SS 
  • Maraimalai nagar 110 KV SS
  • Padappai  110 KV SS
  • Moosivakkam 110 KV SS.
  • Thiruporur 110 KV SS
  • Cheyyur 110 KV SS
  • Illedu 110 KV SS.
  • Anjur 110 KV SS.
  •  Velur 110 KV SS
  • 110 KV Omega  SS
  • Chengalpattu 110 KV SS
  • 33 KV substation 
  • Poonchery 33 KV SS
  • Nerumbur 33 KV SS 
  • Vengambakkam 33 KV SS
  • Nugumbal 33 KV SS           
  • Orathy 33 KV SS                 
  • Polambakkam 33 KV SS
  • Maduranthagam 33  KV SS.
  • Ramapuram 33 KV SS.
  • Kunnavakkam 33KV SS
  • S.V.Chatram 33 KV SS. 
  • Veerapuram 33 KV SS.
  • Guduvanchery 33 KV SS                            
  • Sidco Maraimalai nagar33 KV SS                
  • Palayanur unmanned SS.
  • CMC Chengalpattu (Unmanned) SS 
  • Kilanur 33 KV SS.
  • Mappedu 33 KV SS
  • Adayalachery 33 KV SS 
  • Kadugupattu 33 KV SS
  • Vedhachalanagar 33 KV SS. (Unmanned)
  • Salavakkam  33 KV SS.
Attachment : 
.xls   Shut Down June 2015.xls (Size: 35 KB / Downloads: 287)