Construction Of Coffer Dam - A Case Study

0
   
Full Name :Aravinth M
College Name :KPR Institute Of Engineering & Technology
Department :Civil Engineering
Study Material Description :Construction Of Coffer Dam - A Case Study

This paper presents an overview of the present state of construction of cofferdam techniques with special emphasis and a brief on other techniques developed world over for mitigating hydraulic forces on the temporarv structures. A cofferdam is a temporarv structure designed to keep water and soil out of the excavation in which a bridge pier or other structure is built. When construction must take place below the water level, a cofferdam is built to give workers a drv work environment. 

Attachment : 
.pdf   Construction Of Coffer Dam - A Case Study.pdf (Size: 546.95 KB / Downloads: 288)

    Construction Of Coffer Dam - A Case Study
İlginizi çekebilir:
  • Coffer Dam Lecture Notes