CE2203 CONSTRUCTION TECHNIQUES, EQUIPMENT AND PRACTICES ppt

3
ANNA Anna University Logo UNIVERSITY
DEPARTMENT OF CIVIL ENGINEERING

SECOND YEAR
THIRD SEMESTER
CONTENT : 1st UNIT POWER POINT PRESENTATION
TOPICS :

  1. BOX JACKING,PIPE JACKING ,
DIAPHRAGM WALLS,PILING AND PILING TECHNIQUES,
PILING AND PILING TECHNIQUES,COFFERDAM,
CABLE ANCHORING,GROUTING
ATTACHMENT TYPE : MS ppt
Attachment HERE :
Arrow
.ppt   1.1 BOX JACKING.ppt (Size: 335.5 KB / Downloads: 6,457)
.ppt   1.2 PIPE JACKING.ppt (Size: 283.5 KB / Downloads: 5,296)
.ppt   1.3 DIAPHRAGM WALLS (1).ppt (Size: 169.5 KB / Downloads: 8,514)
.ppt   1.5 PILING AND PILING TECHNIQUES.ppt (Size: 1.57 MB / Downloads: 4,183)
.ppt   1.6 CAISSON.ppt (Size: 966.5 KB / Downloads: 6,811)
.ppt   1.7 COFFERDAM.ppt (Size: 2.87 MB / Downloads: 6,644)
.ppt   1.8 CABLE ANCHORING.ppt (Size: 61 KB / Downloads: 7,194)
.ppt   1.9 GROUTING.ppt (Size: 1.06 MB / Downloads: 8,770)
ALL THE BEST
Bye1
Success is when your Signature turns to Autograph.

+2 reps added for your nice start

but post the thread in "civil lecturer notes" you are posted in 4th sem civil notes
"Good Decision comes from Experience"
But,
"Experience comes from Bad Decision"

                                                                                      -Abdul Kalam

How to move my thread to civil lecture notes bro ??
Success is when your Signature turns to Autograph.


    CE2203 CONSTRUCTION TECHNIQUES, EQUIPMENT AND PRACTICES ppt